Home/Verena Engelniederhammer

About Verena Engelniederhammer

This author has not yet filled in any details.
So far Verena Engelniederhammer has created 37 blog entries.

Press Release

Energy saving power supply for testing of electric power trains up to 1 MW With multi-channel test and simulation system for DC applications, GK can put the energy of the DC power train in a circle. Each DC converter is bidirectional with an efficiency of 99% at full load and can be controlled individually. These systems are delivered with 2 or for 4 independent controllable bidirectional output channels, were 2 or all 4 channels may also be put in parallel. […]

2020-08-18T09:23:31+02:0018. August 2020|

Hydrogen Online Conference

Virtual Conference // 08. October 2020 www.mission-hydrogen.de/en/ […]

2020-07-23T14:38:26+02:0023. July 2020|

Press Release

comemso and Gustav Klein – a strong team for the future of electric mobility From now on, we offer in cooperation with comemso perfectly coordinated solutions for test and simulation solutions for DC high performance charging stations. […]

2020-07-17T11:05:03+02:0017. July 2020|

Press Release

To round off the product range, Gustav Klein has added the Series HEA-PSB 10000 30 kW into its sales program. […]

2020-07-16T11:50:25+02:0016. July 2020|

AirTech Munich

Munich, Germany // 12. – 14. October 2020 https://www.airtecmunich.com/ […]

2020-06-30T11:48:10+02:0030. June 2020|

Corona Virus

We are pleased to inform you that we currently do not expect any effects from the corona virus on the delivery of our units. The reason is the high proportion of in-house production of the systems produced by Gustav Klein in Germany and Austria and the care measures initiated by us at an early stage. We are in constant contact with our most important suppliers and are informed about all relevant changes in the situation. Concerning our service at site we restrict it to the absolute necessary operations.

2020-04-23T14:09:45+02:0023. April 2020|

Automotive Testing Expo China

Shanghai, China // 14. – 16. September 2020 https://www.testing-expo.com/china/en/ […]

2020-06-03T11:18:37+02:0019. March 2020|

Corona Virus

We are pleased to inform you that we currently do not expect any effects from the corona virus on the delivery of our units. The reason is the high proportion of in-house production of the systems produced by Gustav Klein in Germany and Austria and the care measures initiated by us at an early stage. We are in constant contact with our most important suppliers and are informed about all relevant changes in the situation. Concerning our service at site we restrict it to the absolute necessary operations.

2020-04-23T14:07:13+02:0010. March 2020|

Energy Storage Europe

Düsseldorf // 10. – 12. March 2020 https://www.energy-storage-online.com/ […]

2019-12-16T10:01:39+01:0016. December 2019|

The Future of Transportation Conference

Vienna // 10. – 11. December 2019 https://www.thefutureoftransportconference.com/en/ […]

2019-12-10T08:53:58+01:0010. December 2019|